top of page


Construction damage report in Switzerland: cause, liability and cost
What a construction damage report achieves, why timing is decisive, which notice periods apply since 2026 and what it costs in Switzerland.

Simon Käslin
Oct 610 min read


Buying a new build in Switzerland: what private buyers must check
Buying a new build in Switzerland: what does the purchase contract say, what really counts in the building specification, and why is the handover the decisive moment? Independent advice for private buyers.

Simon Käslin
May 188 min read


Property Handover in Switzerland: Rights and Checklist
A property handover in Switzerland transfers risk, starts the warranty periods and decides which defects you can still claim. What the acceptance protocol changes, how to report defects correctly, and when you may refuse acceptance under Art. 368 OR.

Simon Käslin
Apr 2815 min read


Warranty and warranty periods in Switzerland
You have bought or built a home in Switzerland and wonder how long the contractor is liable for defects. This guide explains the warranty periods in Switzerland after 2, 5 and 10 years and how to report defects in time.

Simon Käslin
Apr 2814 min read
bottom of page