The contractors have been appointed, and now the site needs precise drawings
Construction drawings
As an Architect SIA, I am happy to plan the construction of your building project down to the last detail. With working drawings at 1:50, detail drawings and coordination with specialist engineers and contractors, my construction drawings give everyone involved a clear working basis, without guesswork or costly improvisation.
✔ Your architect between specialist engineers and contractors
✔ Working and detail drawings for all trades
✔ Shop drawings checked before production
100+
Supervised projects
17+
Years of experience
5-star
Google review
100%
Independent
Who construction drawings are for
✔
For anyone building with individual contractors who needs drawings that allow clean, accurate construction
✔
Especially for conversions, where new meets old
✔
If interfaces on your site are unresolved, for example at the roof edge, windows or waterproofing
✔
If a buyer change request or an alteration needs to be cleanly incorporated into the drawings afterwards
What is included and how does it work?
How the construction drawings work
1. Free initial consultation
Via Teams or by phone, I get to know you and your project. What matters to you, how has the project gone so far, and where are there open points?
2. Familiarisation
I study the design project, all plan versions, permit conditions and contracts for works, and clarify any open decisions on materials and fit-out with you.
3. Working drawings 1:50
I draw floor plans, sections and elevations at a scale of 1:50 with all dimensions, build-ups and material specifications. They are the working basis for the main contractor, window fitter, sheet metal worker and all other trades.
4. Details
For junctions and interfaces, I draw details at a scale of 1:20 to 1:1, for example window junctions, roof edges, thresholds or transitions between waterproofing and facade. For tricky areas, I add an isometric drawing.
5. Coordination
I coordinate the drawings with the structural engineer and building services and check the contractors' shop drawings before anything is produced. Where two contractors have to resolve an interface together, I bring them together directly.
6. Approval and updates
Approved drawings go to the site. If something changes, I update the drawings so that the as-built situation is documented at the end. I am available for questions from you and from the site.

How I work on construction drawings
Simon Käslin
Architect SIA and founder
Construction drawings determine whether the work of the individual contractors fits together cleanly. Every contractor and specialist engineer plans their own part. As your architect, I keep an eye on the interfaces and make sure the parts fit together.
Most problems arise at the interfaces, for example where the roof edge meets the facade profile or where the waterproofing joins the threshold. I draw the details so that it is clear who supplies and installs what, and for tricky areas I add an isometric drawing, a three-dimensional sketch of the building elements and pipes. I check shop drawings before anything is produced. At the end, you receive drawings that document your building correctly.
✔ Every interface has a clear responsibility
✔ Details are ready before anything is built
✔ At the end, the drawings show what was actually built
✔ I am there for questions from you and from the site
Fee calculator
The calculator shows you in a few seconds roughly what architect's fee to expect. Enter your estimated project costs and select the services you need.














