You want to build, renovate or add something and need a permit
Building permit application
As an Architect SIA, I will gladly prepare your building permit application with drawings, forms and supporting documents and see it through to the building permit. I am your contact person with the municipality and take the load off you, whether for a new build, a renovation or a smaller project such as a heat pump, pergola, extension or change of use.
✔ Your contact person with the municipality
✔ Your project checked against building law in advance
✔ Support through to the building permit
100+
Supervised projects
17+
Years of experience
5-star
Google review
100%
Independent
Who the building permit application with me is right for
✔
For anyone who is building, renovating or adding something and needs a permit for it
✔
Especially for smaller projects such as a heat pump, pergola, conservatory, extension or change of use
✔
If it is unclear whether your project requires a permit or which procedure applies
✔
If the municipality has asked for additional information or rejected an application
What is included and how does it work?
How the building permit application works
1. Free initial consultation
Via Teams or by phone, I get to know you and your project. What would you like to build, what matters to you, and are there deadlines, neighbours or earlier permits that play a role?
2. Documents and building law review
You send me everything you have. I check the zoning plan, the building and zoning regulations, the cadastre of public-law restrictions on land ownership (PLR cadastre) and special rules such as forest clearance, watercourse zones or protection of the townscape. Afterwards you know whether an ordinary procedure, a simplified procedure such as the notification procedure, or no permit at all is required.
3. Preliminary clarification with the municipality
Where a regulation is open to interpretation, I clarify the point with the building authority in advance. This saves rejections and weeks of time.
4. Drawings and supporting documents
I prepare the application drawings with site plan, floor plans, sections and elevations, fill in the forms and coordinate the required supporting documents. Depending on the project, these include energy, noise protection for air-to-water heat pumps, fire protection and drainage.
5. Signature and submission
You review the dossier and sign as the client, as do the landowners. I then submit the application to the municipality.
6. Support through to the decision
I answer queries from the authority, provide additional documents and keep you informed about the public display and deadlines. After the building decision, I explain the conditions to you and what needs to be done before construction starts. I remain available for your questions after that, too.

How I work on a building permit application
Simon Käslin
Architect SIA and founder
A building permit application gets through fastest when it is complete from the start. As an Architect SIA, I prepare it with drawings, forms and supporting documents and am your contact person with the municipality throughout the procedure.
Every rejection costs weeks and can delay the entire construction schedule. That is why, before I start drawing, I clarify which procedure applies and where the sensitive points are, such as boundary and forest clearances, watercourse zones, heat pump noise or design requirements in historic centre zones. Where a rule is open to interpretation, I check with the building authority beforehand. This way you submit a complete application with a realistic chance of success.
✔ The procedure is clarified before any effort is spent
✔ I discuss sensitive points with the municipality in advance
✔ I tell you honestly if the chances of a permit are low
✔ I am there for your questions after the building decision, too
Fee calculator
The calculator shows you in a few seconds roughly what architect's fee to expect. Enter your estimated project costs and select the services you need.















