The pre-handover inspection of your apartment or house is coming up, and you want to find defects while the rooms are still empty
Pre-handover inspection
I am happy to accompany you at the pre-handover inspection of your new-build apartment or house. As an independent Architect SIA, I check everything that has been completed, technically and against your order, so that defects are rectified before handover and not only after you have moved in.
✔ Independent expert at your side
✔ Everything you bought and ordered, checked
✔ Defects tracked right up to handover
100+
Supervised projects
17+
Years of experience
5-star
Google review
100%
Independent
Who the pre-handover inspection matters for
✔
For anyone who will soon take over an apartment or a house and has been invited to a pre-handover inspection
✔
Especially if you have ordered many buyer change requests, such as a different kitchen, different tiles or additional sockets
✔
If you want defects rectified before your furniture is in the rooms
✔
If your contract leaves little room for manoeuvre at handover, for example because withholding part of the payment is excluded
What is included and how does it work?
How the pre-handover inspection works
1. Free initial consultation
Via Teams or by phone, I get to know you. What matters to you, how has the project gone so far, and what have you already noticed? I also clarify whether your appointment really is a pre-handover inspection or already the binding handover inspection.
2. Documents
You send me the contract, construction specification, all plan versions, your buyer change requests and the order confirmations.
3. Familiarisation
I study your documents in depth and know before the appointment what you are entitled to: which appliances and fittings, which tiles, which parquet in which laying direction. I clarify contradictions in advance, for example a sliding door on the plan and a hinged door in the appliance list.
4. Pre-handover inspection on site
We go through systematically, room by room. I check everything on site, technically and against your order, for example floors and floor coverings with material and laying direction, windows and blinds, kitchen and appliances, bathrooms, electrical installations and ventilation. I also look at the whole and at the quality of workmanship.
5. Report
The site management keeps the defects list. I make sure that every defect found is recorded correctly, with room, building element and finding, rather than as a catch-all item. Where things are unclear, I stand up for you until a good solution in your interest is found.
6. Follow-up
The defects list is usually sent afterwards. I check it again, give you feedback and tell you what must be done by the final handover inspection. If questions come up later, send me a photo, call me or write to me.

How I work at the pre-handover inspection
Simon Käslin
Architect SIA and founder
The pre-handover inspection decides which defects will be rectified before the handover. I accompany you as an independent Architect SIA, know your order from the documents and inspect your property both professionally and technically.
I do not just check whether something looks good, but whether it works and matches what you ordered. That ranges from the laying direction of the parquet to the front panel of the dishwasher. I operate every blind, open every door and measure mounting heights with a laser. I clarify contradictions in the documents before the appointment, so that no time is lost on site.
✔ A clear statement of whether today is the pre-handover inspection or already the handover inspection
✔ Checking orders against documents rather than from memory
✔ Every point specific: room, building element, finding
✔ I am still there for you after the appointment
Fee calculator