top of page

The handover of your apartment or house was almost two years ago, and you want to give notice of your defects before the notice period expires

Two-year warranty inspection

I will gladly support you with the two-year warranty inspection of your apartment or house. As an independent Architect SIA, I check your property specifically for defects before the notice period expires, prepare a defects report with photos and help you give written notice of the defects in time.

✔   An independent expert on your side

✔   My own defects report with photos

✔   Support with the notice of defects before the deadline

Website-header-1920px-v6_edited_edited.jpg

Simon Käslin

Architect SIA, 17+ years of experience

⭐⭐⭐⭐⭐

5.0 on Google

Flat fee.

CHF 1,800
100+

Supervised projects

17+

Years of experience

5-star

Google review

100%

Independent

Who the two-year warranty inspection matters for

✔

For anyone whose handover was almost two years ago

✔

Especially if cracks, moisture, creaking parquet or noises have appeared since you moved in

✔

If defects from the handover report are still open

✔

Even if nobody invites you to a warranty inspection, because the period runs regardless

Inspection for the two-year warranty inspection of a semi-detached house on Lake Zurich with independent owner's representative
Semi-detached house in Grüt (ZH) – Project handover and completion of the detailed design in the ongoing construction project

Construction documentation for a semi-detached house in Grüt, Zurich

Inherited plans with open questions. How a stalled project became a buildable one again.

Inspection for the two-year warranty inspection of a semi-detached house on Lake Zurich with independent owner's representative
Preliminary design for a single-family house in the Zurich Oberland region with a comparison of variants and a massing study

Preliminary design for a single-family home in the Zurich Oberland region of Zurich

I have the land, but what exactly should the house look like?

Inspection for the two-year warranty inspection of a semi-detached house on Lake Zurich with independent owner's representative
Interior view of the living and dining area in the preliminary design beach house Spain: Central lounge with open floor plan, focus on quality of stay and connection to the outside space

Preliminary design beach house Spain

How a small beach house became a functioning holiday home for two families, despite minimal space.

What is included and how does it work?

How the two-year warranty inspection works

1. Free initial consultation

Via Teams or by phone, I get to know you. What have you noticed since moving in, what is still open from the handover, and how has the developer responded so far?

 

2. Documents

You send me the contract, the handover report, your notes and photos, and the correspondence so far.

 

3. Preparation

I study the documents closely and clarify exactly when the period began, who is liable under the warranty and whether, after two years, your contract only provides for an assignment of claims against the individual contractors.

 

4. Inspection on site

In addition to your points, I check everything on site, technically and against your contract, for example floors and walls, windows, kitchen, wet rooms, balcony and basement. I look particularly closely where defects only appear over time: moisture, falls, cracks, joints and rust.

 

5. Defects report

I prepare a defects report. Every defect is listed with a photo, room, finding and measure, with no catch-all items.

 

6. Notice of defects and follow-up

I help you give written notice of the defects by registered mail, with a deadline for a response and for rectification. I push for a solution in your interest and remain available for questions afterwards.

Simon Käslin, architect and Owner's Construction Advisor, raumwert plus
How I work on the two-year warranty inspection

Simon Käslin

Architect SIA and founder

After two years in your new home, defects often appear that nobody could see at the handover. I support you as an independent Architect SIA and inspect your property before the notice period expires.

The two years are not a waiting period but a notice period. If SIA 118 has been agreed, during this time it is generally the contractor who has to prove that there is no defect, after that the burden of proof lies with you. I check specifically where defects appear over time, for example moisture, waterproofing, falls, cracks and rust. I record every finding with a photo, the room and the measure, as the basis for your notice of defects.

✔   Not missing the deadline

✔   Every defect listed individually, with a photo and location

✔   Clear from a building perspective, legally together with your lawyer

✔   I am there for you after the notice of defects, too

Fee calculator

The calculator shows you in a few seconds roughly what architect's fee to expect. Enter your estimated project costs and select the services you need. 

Owner's construction advisory references

Is this right for your situation?

Send me a short note on what is coming up. You will receive a reply with a price and a proposed date on the same or the next working day.

eigenheimwissen.ch, the companion knowledge platform by raumwert plus
Simon Käslin, SIA-certified architect and owner's construction advisor in Uster

Knowledge explained

Contact form

We will gladly take the time to address your concerns.

bottom of page