The defects in your handover report have been reported as rectified, and you want to know whether that is true
Follow-up inspection
I am happy to check on site whether the defects in your report have been rectified properly and permanently. Often, however, your photos are enough. I tell you that openly beforehand.
✔ Independent assessment on your side
✔ Every recorded defect professionally checked
✔ An honest answer on whether the appointment is needed
100+
Supervised projects
17+
Years of experience
5-star
Google review
100%
Independent
Who the follow-up inspection is for
✔
For anyone whose defects from the handover inspection have been reported as rectified and who wants this checked professionally
✔
Especially for technically tricky defects, for example in waterproofing, windows or bathrooms
✔
If a repair looks like a patch-up job
✔
If many points were open and the deadline for rectification is running out
What is included and how does it work?
How the follow-up inspection works
1. Quick check-in
Send me your handover report, the feedback from the site management and your photos. Often I can already clarify by phone or WhatsApp whether an inspection on site is needed at all.
2. Set a deadline
If the report does not include a deadline for rectification, set one yourself in writing. You do not need the site management's consent to do so. Which deadline is reasonable depends on your contract and on the type of defects, SIA 118 or the Swiss Code of Obligations (OR). I tell you what applies in your case.
3. Familiarisation
I go through the report and the feedback point by point and decide what I need to look at on site and what you can document with photos.
4. Inspection on site
I check each open defect individually, technically and in context: has it been rectified properly and permanently, or just painted over, stuffed in or concealed? If I notice anything new, I tell you.
5. Result and follow-up
You receive a list of points that are done, still open or not properly rectified, together with a recommendation on how to demand the open points in writing. I work to have them resolved in your interest and remain available for questions.

How I work at the follow-up inspection
Simon Käslin
Architect SIA and founder
When the site management reports that all defects have been dealt with, a second, professional look is worthwhile for tricky points. As an independent Architect SIA, I assess for you whether a repair has been done properly or just looks good.
To be honest, I do not recommend the follow-up inspection as standard. Often a photo is enough, and you can tick off small things like paint spots yourself. An on-site visit is worthwhile when there are many or tricky points: waterproofing, the fall in the shower, leaking windows. There, I check each defect individually, because painting over it or just gluing it in place is not enough. Whatever has not been rectified, I record in such a way that you can demand it again in writing.
✔ Saying honestly when you do not need me
✔ A repair means professional and permanent
✔ Checking every point individually rather than ticking them off wholesale
✔ I am still there for your questions afterwards
Fee calculator
The calculator shows you in a few seconds roughly what architect's fee to expect. Enter your estimated project costs and select the services you need.


















