You are planning a conversion, a renovation or a house purchase and need reliable figures

Cost estimate

Before you buy, convert or speak to the bank, you should know what you really need to budget for. As an Architect SIA, I would be glad to prepare a cost estimate for your conversion, renovation or new build, structured according to the Swiss construction cost classification (BKP), accurate to ±15% and prepared as a basis for your meeting with the bank.

✔   Independent figures, not from the contractor

✔   Every item traceable by BKP

✔   Set up for the meeting with the bank

Website-header-1920px-v6_edited_edited.jpg

Simon Käslin

Architect SIA, 17+ years of experience

⭐⭐⭐⭐⭐

5.0 on Google

Guide price in the fee calculator on this page. Initial consultation free.

Fee based on SIA 102
100+

Supervised projects

17+

Years of experience

5-star

Google review

100%

Independent

Who a cost estimate is for

✔

For anyone who wants to know, before a purchase, conversion or renovation, what they really need to budget for

✔

Especially when the bank requires a cost estimate for the mortgage

✔

When you want to know which measures are value-enhancing and which are value-preserving

✔

Also for smaller projects such as a new kitchen, windows, a heat pump or an extension

Feasibility study and preliminary design for a conversion of existing buildings, including massing study and area breakdown
Semi-detached house in Grüt (ZH) – Project handover and completion of the detailed design in the ongoing construction project

Construction documentation for a semi-detached house in Grüt, Zurich

Inherited plans with open questions. How a stalled project became a buildable one again.

Feasibility study and preliminary design for a conversion of existing buildings, including massing study and area breakdown
Preliminary design for a single-family house in the Zurich Oberland region with a comparison of variants and a massing study

Preliminary design for a single-family home in the Zurich Oberland region of Zurich

I have the land, but what exactly should the house look like?

Feasibility study and preliminary design for a conversion of existing buildings, including massing study and area breakdown
Interior view of the living and dining area in the preliminary design beach house Spain: Central lounge with open floor plan, focus on quality of stay and connection to the outside space

Preliminary design beach house Spain

How a small beach house became a functioning holiday home for two families, despite minimal space.

What is included and how does it work?

How the cost estimate works

1. Free initial consultation

On Teams or by phone, I get to know you and your plans. What needs to be done, what do you need the figures for, and is there a budget set by the bank or a deadline for a purchase offer?

 

2. Documents and familiarisation

You send me drawings, photos, sales documentation and any existing quotes. I familiarise myself with the project and take quantities such as window, floor, wall and ceiling areas from the drawings.

 

3. Site visit

As a rule, I look at the property in person, for example the roof, façade, windows, kitchen, bathrooms and heating. This shows me what the documents do not and which ancillary work will be needed.

 

4. Cost estimate by BKP

I calculate each item using current regional guide prices, including ancillary work such as removal, disposal, scaffolding and site set-up. Fees, additional building costs and a contingency are added.

 

5. Classification and report

On request, I classify each measure as value-enhancing or value-preserving. You receive a summary by cost group, the detailed items and the assumptions.

 

6. Discussion and follow-up

We go through the figures together. If the scope changes or the bank sets a budget, I adjust the estimate. If quotes come in later, I am still available for questions.

Simon Käslin, architect and Owner's Construction Advisor, raumwert plus
How I work on cost estimates

Simon Käslin

Architect SIA and founder

Whether it is a purchase, a conversion or a renovation: a decision is only as good as the figures behind it. Quotes show one contractor's part, and sales documentation rarely shows the full renovation need. I calculate independently and completely, so you can see what you need to budget for in total.

The right time is before you sign. I calculate according to the Swiss construction cost classification (BKP), with quantities taken from the drawings and current guide prices, including the ancillary work that is often missing: for new windows, for example, removal, disposal, blinds and window sills. On top of that comes a contingency for whatever turns up when walls are opened. It is best to clarify early with your bank which documents it requires, and I will structure the estimate accordingly.

✔   Every figure is derived and traceable

✔   Ancillary work is included, not forgotten

✔   I tell you openly if your budget is not enough

✔   Even when quotes come in later, I am there for your questions

Fee calculator

The calculator shows you in a few seconds roughly what architect's fee to expect. Enter your estimated project costs and select the services you need. 

Architecture references

Is this right for your situation?

Send me a short note on what is coming up. You will receive a reply with a price and a proposed date on the same or the next working day.

eigenheimwissen.ch, the companion knowledge platform by raumwert plus
Simon Käslin, SIA-certified architect and owner's construction advisor in Uster

Knowledge explained