Your project is ready and you need comparable quotes
Tendering and award
To make sure you pay a fair price for complete work, I am happy to take on the tendering of the building works, with my own bill of quantities for each trade, measurement drawings and a project briefing. I compare the quotes item by item and prepare contracts for works that protect your interests as the client.
✔ Independent, on the client's side
✔ Complete, comparable quotes
✔ Contracts for works that protect your interests
100+
Supervised projects
17+
Years of experience
5-star
Google review
100%
Independent
Who tendering and award with me is right for
✔
For anyone building or refurbishing who wants to be sure they are paying a fair price for complete work
✔
Especially if your quotes can't be compared because each one includes something different
✔
For property managers and condominium owners' associations with a refurbishment of the facade, roof or building services
✔
If you are building with individual trade contractors rather than a general contractor
What is included and how does it work?
How tendering and award work
1. Free initial consultation
By Teams or phone, I get to know you and your project. What matters to you, how has the project gone so far, and do you already have quotes or contractors you would like to include?
2. Familiarisation and contract packages
I work through the drawings, permit, budget and existing quotes. I then split the project into sensible trade packages and decide what goes out to tender and what is awarded directly on the basis of two to three quotes.
3. Bills of quantities and measurement
For each trade I prepare a separate bill of quantities, with quantities taken from measurement drawings and all ancillary work, such as scaffolding, site setup, dismantling, disposal, window sills and junctions. A project briefing describes the property, the dates and the ground rules.
4. Selecting and inviting contractors
I check potential contractors for size, references and their entry in the commercial register, and usually invite five per trade. The aim is at least three comparable quotes.
5. Quote comparison and adjustment
I compare the quotes item by item, clarify gaps and ambiguities directly with the bidders and recalculate the adjusted prices. I handle all the queries with the contractors.
6. Award recommendation and contracts for works
You receive an award recommendation with my advice and the reasons for it. Once you have decided, I prepare the contracts for works on my template and you sign as the client. I remain available afterwards for any questions about quotes and contracts.

How I work on tendering and award
Simon Käslin
Architect SIA and founder
Tendering and award cover the largest share of your construction costs. You can only decide fairly if the quotes are comparable. As an independent Architect SIA, I make sure that every bidder quotes for the same thing.
Often one includes the scaffolding and another doesn't, while a third forgets the window sills. The lowest quote then turns out to be the least complete, and the difference comes back later as a change order. That is why I draw up my own bills of quantities, with quantities taken from measurement drawings and all ancillary work included. When selecting contractors, I look at references and creditworthiness, not just price. That way you see what each item of work actually costs.
✔ Every bidder quotes for the same thing
✔ Ancillary work is in the bill of quantities, not in a change order
✔ The award recommendation shows you why I recommend whom
✔ I am still there for your questions after the award
Fee calculator
The calculator shows you in a few seconds roughly what architect's fee to expect. Enter your estimated project costs and select the services you need.