top of page

The handover of your apartment or house is coming up, and you want to understand what you are signing

Final handover inspection

With the final handover inspection of your apartment or house, your property is formally handed over to you. As an independent Architect SIA, I am glad to be at your side, check everything technically and against your order, and make sure that every defect is in the report before you sign.

✔   Independent expert, working only for you

✔   Your property professionally checked before the handover

✔   A complete report before you sign

Website-header-1920px-v6_edited_edited.jpg

Simon Käslin

Architect SIA, 17+ years of experience

⭐⭐⭐⭐⭐

5.0 on Google

Apartment CHF 1,200, house CHF 1,400, flat fee.

from CHF 1,200
100+

Supervised projects

17+

Years of experience

5-star

Google review

100%

Independent

Who the final handover inspection matters for

✔

For anyone taking over an apartment or house who wants a professional at their side at the handover

✔

Especially if the handover is the only inspection because there is no pre-handover inspection

✔

If a lot was left open at the pre-handover inspection

✔

If you want to understand exactly what you are signing

Inspection for the two-year warranty inspection of a semi-detached house on Lake Zurich with independent owner's representative
Semi-detached house in Grüt (ZH) – Project handover and completion of the detailed design in the ongoing construction project

Construction documentation for a semi-detached house in Grüt, Zurich

Inherited plans with open questions. How a stalled project became a buildable one again.

Inspection for the two-year warranty inspection of a semi-detached house on Lake Zurich with independent owner's representative
Preliminary design for a single-family house in the Zurich Oberland region with a comparison of variants and a massing study

Preliminary design for a single-family home in the Zurich Oberland region of Zurich

I have the land, but what exactly should the house look like?

Inspection for the two-year warranty inspection of a semi-detached house on Lake Zurich with independent owner's representative
Interior view of the living and dining area in the preliminary design beach house Spain: Central lounge with open floor plan, focus on quality of stay and connection to the outside space

Preliminary design beach house Spain

How a small beach house became a functioning holiday home for two families, despite minimal space.

What is included and how does it work?

How the final handover inspection works

1. Free initial consultation

By Teams or phone, I get to know you. What matters to you, how has the project gone so far, and how have you found working with the site management? That way I know the background before I open the documents.

 

2. Documents

You send me the contract, construction specification, all plan versions, your buyer change requests and the reports from previous inspections.

 

3. Familiarisation

I study your documents thoroughly and know what you are contractually entitled to. I read the rules on handover, rights in respect of defects and payment particularly carefully.

 

4. Final handover inspection on site

I arrive a little early and look at the building from the outside. With the site management, we first clarify the occupancy permit, warranty periods, meter readings, keys and spare materials. We then go through systematically, room by room, and I check everything technically and against your order, for example surfaces and floor coverings, windows and blinds, kitchen and appliances, bathrooms, electrical installations and ventilation.

 

5. Report

The report is kept by the site management. I make sure that every defect found is recorded correctly, and we go through it line by line before you sign. Disputed points still go in, if necessary marked "disputed", and I work towards a solution in your interest.

 

6. Follow-up

As soon as the official report is available, I check it again, give you my feedback and tell you which deadlines apply under your contract, SIA 118 or the Swiss Code of Obligations (OR). I also tell you what to look out for in the first few months. After that, you can reach me easily by photo, call or message.

Simon Käslin, architect and Owner's Construction Advisor, raumwert plus
How I work at the final handover inspection

Simon Käslin

Architect SIA and founder

A lot is at stake at a final handover inspection: with your signature, benefit and risk pass to you and the warranty periods begin. I accompany you as an independent Architect SIA and check your property professionally, technically and against your order.

On the day, I compare what you are entitled to according to the documents with what has been built. I open every cupboard, run every blind and turn on every tap. A washbasin fitted five centimetres too low only stands out if someone puts the drawings next to it. Before you sign, we go through the report together line by line.

✔   You understand what you are signing

✔   Better one point too many in the report than one too few

✔   Enough time rather than a rushed handover

✔   I am still there for you after the inspection

Fee calculator

The calculator shows you in a few seconds roughly what architect's fee to expect. Enter your estimated project costs and select the services you need. 

Owner's construction advisory references

Is this right for your situation?

Send me a short note on what is coming up. You will receive a reply with a price and a proposed date on the same or the next working day.

eigenheimwissen.ch, the companion knowledge platform by raumwert plus
Simon Käslin, SIA-certified architect and owner's construction advisor in Uster

Knowledge explained

Contact form

We will gladly take the time to address your concerns.

bottom of page