The handover of your apartment or house is coming up, and you want to understand what you are signing
Final handover inspection
With the final handover inspection of your apartment or house, your property is formally handed over to you. As an independent Architect SIA, I am glad to be at your side, check everything technically and against your order, and make sure that every defect is in the report before you sign.
✔ Independent expert, working only for you
✔ Your property professionally checked before the handover
✔ A complete report before you sign
100+
Supervised projects
17+
Years of experience
5-star
Google review
100%
Independent
Who the final handover inspection matters for
✔
For anyone taking over an apartment or house who wants a professional at their side at the handover
✔
Especially if the handover is the only inspection because there is no pre-handover inspection
✔
If a lot was left open at the pre-handover inspection
✔
If you want to understand exactly what you are signing
What is included and how does it work?
How the final handover inspection works
1. Free initial consultation
By Teams or phone, I get to know you. What matters to you, how has the project gone so far, and how have you found working with the site management? That way I know the background before I open the documents.
2. Documents
You send me the contract, construction specification, all plan versions, your buyer change requests and the reports from previous inspections.
3. Familiarisation
I study your documents thoroughly and know what you are contractually entitled to. I read the rules on handover, rights in respect of defects and payment particularly carefully.
4. Final handover inspection on site
I arrive a little early and look at the building from the outside. With the site management, we first clarify the occupancy permit, warranty periods, meter readings, keys and spare materials. We then go through systematically, room by room, and I check everything technically and against your order, for example surfaces and floor coverings, windows and blinds, kitchen and appliances, bathrooms, electrical installations and ventilation.
5. Report
The report is kept by the site management. I make sure that every defect found is recorded correctly, and we go through it line by line before you sign. Disputed points still go in, if necessary marked "disputed", and I work towards a solution in your interest.
6. Follow-up
As soon as the official report is available, I check it again, give you my feedback and tell you which deadlines apply under your contract, SIA 118 or the Swiss Code of Obligations (OR). I also tell you what to look out for in the first few months. After that, you can reach me easily by photo, call or message.

How I work at the final handover inspection
Simon Käslin
Architect SIA and founder
A lot is at stake at a final handover inspection: with your signature, benefit and risk pass to you and the warranty periods begin. I accompany you as an independent Architect SIA and check your property professionally, technically and against your order.
On the day, I compare what you are entitled to according to the documents with what has been built. I open every cupboard, run every blind and turn on every tap. A washbasin fitted five centimetres too low only stands out if someone puts the drawings next to it. Before you sign, we go through the report together line by line.
✔ You understand what you are signing
✔ Better one point too many in the report than one too few
✔ Enough time rather than a rushed handover
✔ I am still there for you after the inspection